FITTING OUT (PHASE 2)
|
The windows being fitted. I put fairly large windows in the design spec so
that the inside would be bright even on dull days.
I chose gold powder coated aluminium windows from Channelglaze.
Powder coating is said to be much more weather resistant than anodising,
although the finish is not quite so sparkling. I wanted gold windows to
complement the royal blue paint of the finished boat.
Delivery of the windows was a bit late and this held up progress for a while
because the internal panels above the gunwales could not be fitted until the
windows were in place.
(Photo taken 20th September 2002).
|
![]() |
|
With the windows in place, the ash faced side panels and hardwood
window surrounds could be fitted. I wanted the window surrounds
to follow the profile of the round window corners. The hardwood looks
like mahogany but is actually utile, which is more available and arguably
more environmentally acceptable.
One could begin to see how the inside would look when finished. Note the
wires dangling from the ceiling where the recessed halogen spotlights were to go.
(Photo taken 2nd October 2002)
|
|
|
The galley taking shape, and the hardwood window trims being finished off
(left and right foreground).
(Photo taken 11th October 2002)
|
|
|
Other bits of the boat were coming together too.
This is the countertop basin in the utility room. Pete Beck (Weltonfield's
carpenter) made a nice job of the FormicaŽ top and the
curved utile edge trim.
The Candy Aqua 10 washing machine is underneath the countertop. On the right
of the picture you can just see its protective polythene sheeting.
(Photo taken 25th October 2002).
|
|
|
Discussing details with Pete on 25th October 2002.
I was always made welcome during the Weltonfield fit-out, and they made a point
of asking me how I wanted things to be done.
Sometimes they suggested that my proposals were not such a good idea.
They usually had good arguments based on years of boatbuilding experience.
But if I had a good reason for wanting things to be done in a
particular way we found a compromise solution and everyone was happy! |
|
|
The 18.5 gallon calorifier (hot water tank) in place, all plumbed in
and wired up. It's really the same as a domestic hot water cylinder except that
there are two heating coils - one from the engine and one from the gas boiler.
To top right of the calorifier (fixed to the sidewall)
is the blender valve which controls the temperature of the hot tap water.
To the left of the calorifier is the 'consumer unit' with
circuit breakers for the 230V circuits.
One hour after this picture was taken (12th November 2002), the calorifier
was boxed in behind an ash cupboard unit built to Weltonfield's
usual high standard. If this big calorifier has to come out for any reason, I
think the cupboard will have to be dismantled first! |
![]() |
|
The escape window in the bedroom (third from left in this picture) was returned to Channelglaze for adjustments, and was very late coming back. It was finally fitted on 7th November 2002. |
|
You may wish to send comments or queries to Alastair:
[ Fitting Out 4 ] [ Paintwork ] [ The Relaunch ] [ The Finished Job ] [ Thumbs ] [ Detailed Spec ] [ Latest Mods ]
[ Re-blacking ] [ External Links ]
Please click on the links below to view details and images:
[ Home Page ] [ Introduction ] [ Drawings ] [ Hull ] [ Delivery ] [ Fitting Out 1 ] [ Fitting Out 2 ] [ Fitting Out 3 ]